Double Make Increase

1 Working on the right side, knit across to the axis stitch. Perform a right-slanting make 1 increase, using the horizontal strand between the last stitch worked and the axis stitch.

2 Knit the axis stitch.

3 Perform a left-slanting make

1 increase (see p. 105 for instructions), using the horizontal strand between the axis stitch and the next stitch to be worked on the left needle. Knit to the end of the row.

0 0

Post a comment